Tiki Photo Gallery
Construction Photos
- Sheathing the Lower Hull
- Fairing and Finishing the Lower Hulls
- Building the Decks and Cabins
- Installing the Upper Bulkheads
- Sheathing Complete
- Exterior Painting Complete
- Painting the Ramp
- Galley Storage
- Forward Berth
- Connecting to the Counterpoise, SSB Radio RF Ground
- The Boatworks Crew
- Constructing the Aft Beam
- Tiny Shaping the Beam Endpiece
- LoLoy Working on the Solar Panel Platform
- Willie paints on the name
- Tops of the masts ready for raising
- Climbing the coconut tree we used to raise the aft mast
- Preparing the forestay bridle
- Lifting the mast to deck level
- Supporting the mast with bamboo "X" frames
- Sorting out the tangles
- At-At saves the day
- Raising the aft mast
- Raising the aft mast, part 2
- Both masts in place
- Installing the radar
— return to the top of the page —
Interior Details
- Entry hatch, forward cabin
- Companionway, forward cabin
- Berth, forward cabin
- Electrics, forward cabin
- Storage & holding tank, head
- Lavac toilet, head
- Storage, head
- Sink, head
- Berth, main cabin
- Nav station & library, main cabin
- Saloon table, galley
- Saloon, galley
- Food storage, galley
- Spice storage, galley
- Stove, galley
— return to the top of the page —
Exterior Photos
- The bows
- The aft ramp, fully lowered to use as a swim ladder
- Port side
- Under sail, foresail & jib
- Under sail, all three sails
- Under sail Jamie at the helm
- At anchor (drying the sails)
- Fetching water with Jim's canvas bucket
- Hoisting the dinghy
- The stern
- Last look, as we leave the Philippines
— return to the top of the page —
Our Nester Dinghy, Indeflatable
— return to the top of the page —
NOTE: For best viewing of the photos, be sure your monitor is set at its highest quality — look in the "Control Panels" for "Monitor" and set your color depth to "Millions", or to the largest number available.